Back to Projects Pages

Concrete Work

This project consisted of concreting new permitted dog pens along with fitting new drainage to suit.

We arrived on site to the interior already blocked into pens and ready for the flooring, we firstly cut out a long channel along the length of the barn, before fitting the drain channels. Each room was lined with a damp proof membrane before the concrete was poured, we started with the pens and eventually worked our way out the barn, concreting the office floor too. Paint was then supplied by the client to cover walls and floor.

Concreting

  • Concreting
  • Drainage fitted
  • Good Falls
  • Industrial painting

Leave a Reply

Your email address will not be published. Required fields are marked *