Back
Before we began the garden had multiple different gravels, cobbles, pebbles and slate chips all of which had bedded into the ground below, a lot of weight was taken out in stones alone before the project could begin. When the decking was built it included two inspection hatches on the floor to access the drains below. Our regular electrician Mark also installed a double socket as a birthday surprise from one client to another on this project.